In 2013 Foundation Engineering Group was engaged to design the Screwpile foundation for a proposed two storey development in the heart of the Perth CBD.
The final project comprised of 41 piles with a safe working load range from 100 to 600Kn.
Foundation Engineering was also engaged to provide construction support.
The following challenges were successfully navigated during the project:
- Restricted working spaces and access
- Restricted work hours
- Logistics for delivery of both materials and equipment through pedestrian areas
- Variable ground conditions
- Uncharted below ground objects
- Installation of pile along site boundaries
- Ensuring continuity of business for surrounding vendors